Indian Railway main logo Welcome to Indian Railways
खोज :  
Increase Font size Normal Font Decrease Font size
View Content in English
National Emblem of India

हमारे बारे में

मंडल

विभाग

निविदाएँ

समाचार एवं अद्यतन

विल कि वर्तमान स्हिथि

हमसे संपर्क करें



 
Bookmark Mail this page Print this page
QUICK LINKS
101 to 150

LIST OF CE CIRCULARS (101-150)

CE�s Circulars No.

Date

Subject

101

16.11.89

Track machines

102

28.02.90

Yards and crossing stations

103

10.08.90

Gang strength

104

27.06.90

Unmanned level xing

105

24.03.90

Prevention of rail and fractures

106

20.09.90

Welding of VIC Gr.A (90 UTS) Rail

107

01.10.90

Strengthening of track in approaches of all Major/important bridges on B.G.

108

1990

Track Drainage

109

06.11.90

Safety precarsion at worksite 

110

 

Rail joints-Fishplated, welded and shed

111

29.01.91

Use of single coil spring washers in track

112

13.02.91

The standard practice of key driving in different types of sleepers

113

19.02.91

Monitoring of track Geometry and ride quality

114

25.03.91

Working of rail dollies

115

30.04.91

Formation width standards for

116

21.05.91

Jt. Traffic & Engg. Circular reg. Traffic blocks

117

05.06.91

Utilisation of steel through sleeper of straight switch trun-outs in curved switch layouts of Turnouts

118

28.08.91

Demarcating & verification of Rly. Boundries & maintenance of records

119

 

not issued

120

16.10.92

Test checks on measurement and quality ballast

121

09.05.94

Track laying quality control and handing/taking over bet. Maintenance unit and construction of Track renewal units

122

30.05.94

Track Drainage

123

07.06.94

Demanning of existing manned level crossing

124

07.07.94

Construction at New un-manned level crossings

125

08.07.94

O' Missing Fittings Gang

126

21.07.94

Contracts for miscellaneous Track works

127

07.02.95

Gang charts and diaries Books

128

07.02.95

Duties of Keyman

129

10.02.95

Incresase of Speed on Turnout and loop lines to 30 Kmph

130

09.06.95

Pre-monsoon works & Monsoon precaution

131

21.08.95

Instruction in connection with the submission of Br. Inspection registers contained in CE's circular No.96 at 1987

132

21.09.95

Working of Push Trollies and lorries

133

28.02.96

Recording of Rail Temperature

134

26.03.96

Periodical examination of Motor Trolley

135

01.05.96

Contracts for miscellaneous Track works

136

25.07.96

Inspection of track by window Trailing/foot plate by AEN, DEN/Sr.DEN on this section

137

04.03.98

Directed maintenance of building

138

25.03.98

Procedure for accountal & disposal of released (SH-scrap) track materials

139

24.03.98

Inspection of structural steel & timber works by AEN & IOWs

140

25.03.98

Maintenance and cleaning of water storage tanks

141

29.04.98

Oiling & greasing of SEJs

142

09.07.98

Restriction to be imposed at the site of TRT working

143

09.07.98

Utilisation of damaged PSC sleeper

144

09.07.98

Attention to track at work spot

145

31.07.98

Visibility requirement along the track for road users at unmanned LCs

146

12.08.98

Granting of way leave facilities/easement right policy regarding

147

19.08.98

Test check of ballst measurements to be carried out by Sr.DENs/DENs in-charge of the section

148

20.10.98

Track renewal proposal for works programme

149

10.11.98

Issue of OES caution order

150

24.12.98

Track works requiring block/speed restriction

 




Source : South Eastern Railway CMS Team Last Reviewed on: 10-04-2013  


  प्रशासनिक लॉगिन | साईट मैप | हमसे संपर्क करें | आरटीआई | अस्वीकरण | नियम एवं शर्तें | गोपनीयता नीति Valid CSS! Valid XHTML 1.0 Strict

© 2010  सभी अधिकार सुरक्षित

यह भारतीय रेल के पोर्टल, एक के लिए एक एकल खिड़की सूचना और सेवाओं के लिए उपयोग की जा रही विभिन्न भारतीय रेल संस्थाओं द्वारा प्रदान के उद्देश्य से विकसित की है. इस पोर्टल में सामग्री विभिन्न भारतीय रेल संस्थाओं और विभागों क्रिस, रेल मंत्रालय, भारत सरकार द्वारा बनाए रखा का एक सहयोगात्मक प्रयास का परिणाम है.