| SLNO. | TENDER NO. | WORK IN BRIEF | DT. OF OPENING | TENDER DOCUMENT |
| 36 | DRM (Engg)/ADA/51/2013 dated 08.05.2013 | OT for Misc. Zonal works for maintenance of Level crossings for the period from 01.07.2013 to 30.06.2014 under the jurisdiction of ADEN/East/Adra. | 14.06.2013 | CLICK HERE |
| 37 | DRM (Engg)/ADA/52/2013 dated 08.05.2013 | OT for Misc. Zonal works for maintenance of Level crossings for the period from 01.07.2013 to 30.06.2014 under the jurisdiction of ADEN/PRR. | 14.06.2013 | CLICK HERE |
| 38 | DRM (Engg)/ADA/53/2013 dated 08.05.2013 | OT for Repairing of dilapidated road (both side of track) at Madhukunda. | 14.06.2013 | CLICK HERE |
| 39 | DRM (Engg)/ADA/54/2013 dated 08.05.2013 | O.T. for Deep screening of track ballast by BCM machine with other allied works for 60.0 km under the jurisdiction ofADEN/BKSC in Adra Division. | 21.06.2013 | CLICK HERE |
| 40 | DRM (Engg)/ADA/55/2013 dated 08.05.2013 | O.T. for Deep screening of track ballast by BCM machine with other allied works for 38.2 km under the jurisdiction ofADEN/Bhojudih in Adra Division.
| 21.06.2013 | CLICK HERE |
| 41 | DRM (Engg)/ADA/56/2013Dtd. 16.05.2013 | O.T. for Supply of portion and welding of 52 kg rail joints by Alumino Thermic SKV process in connection with strengthening of yard line by removal of defective weld by providing thermit welding of rail joints with other related works at BKSC empty yard and departure yard under the jurisdiction of Sr. Divl. Engineer/North/Adra. | 21.06.2013 | CLICK HERE |
| 42 | DRM (Engg)/ADA/57/2013 dated 16.05.2013 | OT for Repairing of stone boulder pitching with earthwork in the deep cutting between DMA - MOH single line KM 316/17 to 317/8 with other related work. | 21.06.2013 | CLICK HERE |
| 43 | DRM (Engg)/ADA/58/2013 dated 16.05.2013 | OT for 1) Provision of Diversion road for closer of unmanned level crossing No. KA-126 at km 268/19-21 between JPH-IBL. 2) Diversion of road from L.C No KA 114 to KA115 for closing of L.C No KA 114 between IBL-JPH. 3) Diversion of road from L.C No KA 103 to KA104 for closing of L.C No KA 103 between BQA-CJN. 4) Diversion of road from L.C No KA 100 to KA 99 for closing of L.C No KA 100 between BQA-CJN.
| 21.06.2013 | CLICK HERE |
| 44 | DRM (Engg)/ADA/59/2013 dated 16.05.2013 | OT for Construction of 02 (two) Nos. Limited Height Subways in lieu of Un-manned level crossings Nos. JC-5 at km 300/2-4 bet. Anara-Bagalia & JC-15 at km 317/25-27 bet. Chhara-Purulia (02 nos. on double line) under the jurisdiction of Adra Division of South Eastern Railway by Cut & cover method. | 21.06.2013 | CLICK HERE |
| 45 | DRM (Engg)/ADA/60/2013 dated 16.05.2013 | OT for Construction of 02 (Two) Nos. Limited Height Subways in lieu of Un-manned level crossings Nos. KA -76 at km 217/11-13 &KA-87 at km 228/7-9 bet. ODM-BQA (02 nos. on double line) under the jurisdiction of Adra Division of South Eastern Railway by Cut & cover method. | 21.06.2013 | CLICK HERE |
| 46 | DRM (Engg)/ADA/61/2013 dated 16.05.2013 | OT for TRR (P) of the existing 60 kg 90 UTS rail with new 60 kg 90 UTS (LWR) rails for 10.96 km at km 355-357 and 364.24-373.2(DN) Anara-Chandil section. | 21.06.2013 | CLICK HERE |