CE’s Circulars No. | Date | Subject |
201 | 01.01.00 | Layout plans of distribution system in connection with water supply in Railway complex |
202 | 24.01.00 | Inspection of over-head steel structures across the track erected by non-railway organisations |
203 | 25.01.00 | Opening of tenders |
204 | 11.02.00 | Bridge inspection by AENs-Quarterly monitoring of compliance |
205 | 06.04.2000 | Train operation during fog-line marking access track at sighting broad during winter. |
206 | 10.04.2000 | Joint procedure order on single line working for Engg. Block in double line Sec. |
207 | 05.05.2000 | Keyman’s daily Track Patrolling. |
208 | 05.05.2000 | Laying of PRC Fan shaped Turnouts. |
209 | 25.05.2K | Maintenance of Pvt. Sidings. |
210 | 20.07.2000 | Measurement of distilling works on rider bed. |
211 | 25.07.2K | River & Flood Register. |
212 | 02.08.2000 | Supply of drinking water to the travelling public at Railway stations. |
213 | 19.09.2000 | Working of temping machine in design mode. |
214 | 28.09.2000 | Safety at work site. |
215 | 10.10.2000 | Maintenance of Stores Records in the units of Sr. Subordinates in the Civil Engineer Department. |
216 | 06.11.2000 | Inspection of Flood, Light Towers. |
217 | 22.11.2000 | Works Programme proposal. |
218 | 27.11.2000 | Preparation of drawing for execution Civil Engineering Works. |
219 | 29.11.20000 | Taking over of new assets from the construction organization. |
220 | 12.02.2001 | LWR Plans. |
221 | 08.03.2001 | Quality of Channel Sleepers. |
222 | 08.03.2001 | Earthquake resistance building & structure. |
223 | 25.04.2001 | Rail renewal on major and important Bridges |
224 | 02.11.2001 | Inspection maintenance and replacement of cast Iron Helical Staircases. |
225 | 05.11.2001 | Durability of plain and Reinforced Cement Concrete Structures. |
226 | 06.11.2001 | Inter divisional movement of Track Machines. |
227 | 06.12.2001 | Use of croqueted Aluminum roofing shuts. |
228 | 01.01.2002 | Design on Buildings structure |
229 | 5/18.02.2002 | Corrective measures for continuing defective welds in track. |
230 | 25.2.2002. | Guide lines for dealing with case granting of way leave facilities/croachment rights on Railway land. |
231 | 22.02.2002 | Destressing of LWR on PSC Sleeper at lower temperature for reduce weld failures. |
232 | 02.03.2002 | Inspection of Bridges by Sectional Sr. DEN/DEN. |
233 | 18/26.03.02 | Management of Tenders and contracts in Division. |
234 | 04.04.2002 | Protecting at welds by providing joggled fishplates in the approaches of major bridges. |
235 | 08.04.2002 | Prevention of seizure/corrosion of ERC. |
236 | 11.04.2002 | End cropping and welding of Rails. |
237 | 14.05.2002 | Annual confidential Report of Contractors. |
238 | 12/18.06.02 | Visual Examination fish plate/welds rail joints and other weak cushions in rail. |
239 | 24.06.2002 | Safety precarsion at worksite in proximity to running track. |
240 | 12/15.07.02 | Procedure order for detection, prevention & removal of encroachment of Railway land in S. E. Railway |
241 | 18.07.2002 | TGI Value. |
242 | 17.10.2002 | Inspection and maintenance of steel Channel sleepers laid on girder Bridges. |
243 | 19.03.2003 | Monitoring and analysis of Rail/Weld fractures. |
244 | 20.3.2003 | Inspection of breathing length & SEJ on LWR by Sr.DEN/DENs of the section AND Recording of Fractures and cuts in LWR along with Rail Temperatures |
245 | 1/5.04.2003 | Special Pay to Gatekeepers of Engineering Department |
246 | 11.07.2003 | Prevention of Accidents at Work Sites |
247 | 29.07.03 | Inspection of Cross Over |
248 | 06.08.2003 | Department Welder wise performance for Alumino-Thermic welding |
184A | 18.09.2003 | Preparedness for restoration of track after accidents |
249 | 18.12.2003 | Metallisation of flooring system of open web girders and foot over bridges |
250 | 05.05.2004 | Installation of Hectometer post along the track |