CE’s Circulars No. | Date | Subject |
101 | 16.11.89 | Track machines
|
102 | 28.02.90 | Yards and crossing stations |
103 | 10.08.90 | Gang strength |
104 | 27.06.90 | Unmanned level xing
|
105 | 24.03.90 | Prevention of rail and fractures |
106 | 20.09.90 | Welding of VIC Gr.A (90 UTS) Rail |
107 | 01.10.90 | Strengthening of track in approaches of all Major/important bridges on B.G. |
108 | 1990 | Track Drainage |
109 | 06.11.90 | Safety precarsion at worksite
|
110 | | Rail joints-Fishplated, welded and shed |
111 | 29.01.91 | Use of single coil spring washers in track
|
112 | 13.02.91 | The standard practice of key driving in different types of sleepers |
113 | 19.02.91 | Monitoring of track Geometry and ride quality |
114 | 25.03.91 | Working of rail dollies |
115 | 30.04.91 | Formation width standards for
|
116 | 21.05.91 | Jt. Traffic & Engg. Circular reg. Traffic blocks |
117 | 05.06.91 | Utilisation of steel through sleeper of straight switch trun-outs in curved switch layouts of Turnouts |
118 | 28.08.91 | Demarcating & verification of Rly. Boundries & maintenance of records |
119 | | not issued
|
120 | 16.10.92 | Test checks on measurement and quality ballast |
121 | 09.05.94 | Track laying quality control and handing/taking over bet. Maintenance unit and construction of Track renewal units |
122 | 30.05.94 | Track Drainage |
123 | 07.06.94 | Demanning of existing manned level crossing |
124 | 07.07.94 | Construction at New un-manned level crossings |
125 | 08.07.94 | O' Missing Fittings Gang |
126 | 21.07.94 | Contracts for miscellaneous Track works |
127 | 07.02.95 | Gang charts and diaries Books |
128 | 07.02.95 | Duties of Keyman |
129 | 10.02.95 | Incresase of Speed on Turnout and loop lines to 30 Kmph |
130 | 09.06.95 | Pre-monsoon works & Monsoon precaution |
131 | 21.08.95 | Instruction in connection with the submission of Br. Inspection registers contained in CE's circular No.96 at 1987 |
132 | 21.09.95 | Working of Push Trollies and lorries |
133 | 28.02.96 | Recording of Rail Temperature |
134 | 26.03.96 | Periodical examination of Motor Trolley |
135 | 01.05.96 | Contracts for miscellaneous Track works |
136 | 25.07.96 | Inspection of track by window Trailing/foot plate by AEN, DEN/Sr.DEN on this section |
137 | 04.03.98 | Directed maintenance of building |
138 | 25.03.98 | Procedure for accountal & disposal of released (SH-scrap) track materials |
139 | 24.03.98 | Inspection of structural steel & timber works by AEN & IOWs |
140 | 25.03.98 | Maintenance and cleaning of water storage tanks |
141 | 29.04.98 | Oiling & greasing of SEJs |
142 | 09.07.98 | Restriction to be imposed at the site of TRT working |
143 | 09.07.98 | Utilisation of damaged PSC sleeper |
144 | 09.07.98 | Attention to track at work spot |
145 | 31.07.98 | Visibility requirement along the track for road users at unmanned LCs |
145 (Rev-1) | 09.04.13 |
146 | 12.08.98 | Granting of way leave facilities/easement right policy regarding |
147 | 19.08.98 | Test check of ballst measurements to be carried out by Sr.DENs/DENs in-charge of the section |
148 | 20.10.98 | Track renewal proposal for works programme |
149 | 10.11.98 | Issue of OES caution order |
150 | 24.12.98 | Track works requiring block/speed restriction |